Girawar village in Rohtak, Haryana, is moving towards a more permanent drinking water arrangement. After around 7,000 feet of 8-inch pipeline was provided and laid in the village, two complete tube-well sets with 10 HP submersible motors and essential installation accessories have now been handed over to the Gram Panchayat under the drinking water service initiatives led by Sant Rampal Ji Maharaj.
- Girawar Drinking Water Assistance: Key Takeaways
- Pipeline Was Provided Before the Tube-Well Equipment
- Two Complete 10 HP Submersible Sets Handed Over
- Gram Panchayat Receives the Equipment
- District Councillor Recounts Her Request
- Electricity Connection and Tube-Well Work
- Assistance Under Kisan Mazdoor Bachao Abhiyan Phase 2
- Annapurna Campaign and the Drinking Water Arrangement
- Moving Towards Household Drinking Water Supply
Villagers had gone with a prayer/request regarding the need for two new tube wells to address the drinking water problem in the village. Following the request, the complete equipment was provided on the instructions of Sant Rampal Ji Maharaj within a few days.
Girawar Drinking Water Assistance: Key Takeaways
- Girawar village is located in Rohtak district, Haryana.
- Around 7,000 feet of 8-inch pipeline was earlier provided and laid in the village.
- Two new tube wells were required to improve the availability of sweet drinking water.
- Two complete submersible sets have been handed over to the Gram Panchayat.
- Each set includes a 10 HP motor and 100 feet of lowering pipe.
- Starters, wires, ropes, PVC fittings and other required accessories were also provided.
- A 20-foot iron pipe was included for road crossing.
- The assistance has been provided under Kisan Mazdoor Bachao Abhiyan Phase 2 and the Shuddh Peyjal Seva Abhiyan.
- Sant Rampal Ji Maharaj has provided the assistance under His Annapurna campaign.
Pipeline Was Provided Before the Tube-Well Equipment
The drinking water arrangement in Girawar has been progressing in stages. Earlier, on the instructions of Tatvdarshi Rampal Ji Maharaj, around 7,000 feet of 8-inch pipeline was provided for the village. The pipeline was subsequently laid underground.
According to the information shared in the programme, a survey was also conducted after the pipeline was laid. With the requirement for two tube wells identified, a request was placed by the village for the necessary equipment.
Also Read: Girawad Flood Relief Phase 2: Hope Returns to Farmers’ Fields Through 41,000 Feet of Pipeline
The latest assistance completes an important part of the proposed arrangement, as two complete submersible sets have now been handed over to the Gram Panchayat.
Two Complete 10 HP Submersible Sets Handed Over
The equipment provided is not limited to the motors. Both tube wells have been supplied with the material required for installation and operation.
| Equipment | Details |
| Submersible motors | Two, 10 HP each |
| Lowering pipes | 100 feet each, 200 feet total |
| Iron pipe | 20 feet, for road crossing |
| Starters | Two |
| Wires | For both motors |
| Ropes | For motor support |
| PVC material | Pipes and fittings |
| Iron handi | For both sets |
| Other accessories | Joints, bends, T and required fittings |
| Fasteners | Steel nuts and bolts |
The equipment included both major and minor accessories required for the two tube wells, so that the village would not have to arrange even small essential items separately.
Gram Panchayat Receives the Equipment
The complete material was formally handed over to the Gram Panchayat of Girawar. Village representatives, the sarpanch and other people associated with the handover were present during the programme. The sarpanch said the village had submitted a prayer regarding the drinking water supply and the requirement for two tube wells. He said that the earlier pipeline had already been laid and that the new equipment had subsequently been provided.
He also said that the assistance would benefit not only people but also animals, birds and other living beings that require drinking water. According to him, the village was happy with the arrangement and expected relief from its drinking water problem once the tube wells become operational.
District Councillor Recounts Her Request
Suman, a district councillor from Ward No. 12, said she had personally gone to Sant Rampal Ji Maharaj around five days earlier with a prayer and application regarding the motors required for the village. According to her, Sant Rampal Ji Maharaj had told her that the motors would reach the village within two to four days. She said the motors were provided on the fifth day.
She also said that she had earlier been involved in taking the pipeline request forward and that the pipeline had been provided before the motors. She described the assistance as addressing a drinking water requirement that, according to her, had not been resolved through the government arrangements mentioned by her.
Electricity Connection and Tube-Well Work
The village representatives also discussed the electricity-related procedure required for operating the tube wells. They stated that the connection process had been initiated and that the two tube wells were being brought near the canal area.
Once the tube wells are operational, the sweet drinking water supply would reach the village and eventually households. Residents and representatives said the availability of water would provide relief because drinking water is required by people as well as livestock and birds.
Assistance Under Kisan Mazdoor Bachao Abhiyan Phase 2
The Girawar assistance has been presented as part of the Kisan Mazdoor Bachao Abhiyan Phase 2, Shuddh Peyjal Seva Abhiyan and Pashudhan Bachao Shuddh Jal Pilao Abhiyan.
These initiatives have already been completed in more than 100 villages facing water-related difficulties. The stated approach is to work at the ground level rather than for public display.
Annapurna Campaign and the Drinking Water Arrangement
The programme also states that Sant Rampal Ji Maharaj has provided the drinking water assistance under His Annapurna campaign. In Girawar, this includes the two complete submersible sets required for the proposed tube wells. The stated objective is to make sufficient, clean and sweet drinking water available in the village and help establish a lasting drinking water arrangement rather than providing only temporary relief.
Moving Towards Household Drinking Water Supply
With the pipeline already laid and the equipment for two tube wells now handed over, Girawar village is moving towards the next stage of its drinking water arrangement. The two 10 HP submersible motors and accompanying equipment are intended to enable the tube wells to be installed and operated. Village representatives have expressed the expectation that this will help make drinking water available across the village and to households.
For more information please visit SA News YouTube Channel.

