SA NewsSA NewsSA News
  • Home
  • Business
  • Educational
  • Events
  • Fact Check
  • Health
  • History
  • Politics
  • Sports
  • Tech
Notification Show More
Font ResizerAa
Font ResizerAa
SA NewsSA News
  • Home
  • Business
  • Politics
  • Educational
  • Tech
  • History
  • Events
  • Home
  • Business
  • Educational
  • Events
  • Fact Check
  • Health
  • History
  • Politics
  • Sports
  • Tech
Follow US
© 2024 SA News. All Rights Reserved.

Home » Nuna Majra Waterlogging Relief: Tatvdarshi Sant Rampal Ji Maharaj Ji Extends Phase 2 Assistance for Permanent Drainage Solution in Jhajjar, Haryana

Social Welfare Work

Nuna Majra Waterlogging Relief: Tatvdarshi Sant Rampal Ji Maharaj Ji Extends Phase 2 Assistance for Permanent Drainage Solution in Jhajjar, Haryana

SA News
Last updated: August 12, 2026 4:38 pm
SA News
Share
Phase 2 Drainage Work in Nuna Majra in Jhajjar by Sant Rampal Ji Maharaj
SHARE

Nuna Majra village in Bahadurgarh Tehsil, Jhajjar district, Haryana, had been facing severe waterlogging during the rainy season as overflowing ponds flooded residential areas, streets and nearby agricultural land. Following a request from the Gram Panchayat, Tatvdarshi Sant Rampal Ji Maharaj Ji extended assistance under the Kisan Mazdoor Bachao Abhiyan Phase 2 by approving drainage infrastructure based on a technical survey.

Contents
  • Key Highlights: Nuna Majra Waterlogging Relief Under Phase 2
  • Survey Identified the Required Drainage Infrastructure
  • Materials Supplied After Survey Approval
  • Installation Process and Inspection
  • Villagers Welcome the Relief Materials
  • Expected Impact on the Village
  • A Step Towards Resolving a Long-Standing Village Issue

The Gram Panchayat approached Tatvdarshi Sant Rampal Ji Maharaj Ji with a prayer seeking a permanent solution to the village’s long-standing waterlogging problem. Acting on His orders, a survey team inspected all four affected locations to assess the drainage requirement before approving the necessary materials.

Key Highlights: Nuna Majra Waterlogging Relief Under Phase 2

  • Nuna Majra faced recurring monsoon waterlogging at four locations.
  • Overflowing ponds affected residential areas, streets and surrounding land.
  • The Gram Panchayat submitted a request under Kisan Mazdoor Bachao Abhiyan Phase 2.
  • A technical survey identified the requirement of 2,000 feet of 8-inch pipeline and four 10 HP motors.
  • Pipeline material and installation accessories were handed over after approval.
  • Four motors will be supplied after successful inspection of the underground pipeline work.

Survey Identified the Required Drainage Infrastructure

According to the ground report, rainwater from village ponds overflowed at four different points, disrupting daily movement, affecting normal life and posing a risk to agricultural fields and standing crops.

Following the Gram Panchayat’s request, the survey team visited all four locations and examined the drainage routes. The technical assessment confirmed that a permanent drainage system would require 2,000 feet of 8-inch pipeline along with four 10 HP motors.

During the inspection, the Sarpanch, Master Jai Bhagwan, said the village had requested motors and pipelines after water repeatedly entered residential areas. He stated that the survey team reached the village immediately after the request was considered.

Materials Supplied After Survey Approval

After the survey report was approved under the orders of Tatvdarshi Sant Rampal Ji Maharaj, the Gram Panchayat received the complete pipeline and all essential installation materials required for the project.

ItemQuantity/Details
Pipeline2,000 feet (8-inch)
MotorsFour 10 HP motors (after final inspection)
AccessoriesAir valves, PVC pipes, PVC bends, adhesive, iron plates, joints, steel nuts & bolts and other required fittings

Representatives explained that supplying all accessories together would allow the underground pipeline work to be completed without additional expenditure on installation fittings.

Installation Process and Inspection

The Gram Panchayat was instructed to check every pipeline joint carefully by releasing water through the system before covering the pipeline with soil. Air valves were also to be installed before the pipeline was buried.

Also Read: Sant Rampal Ji Maharaj’s Annapurna Muhim Phase 2 Brings Lasting Relief to Flood-Hit Dhamtan Sahib Village in Jind

After the underground installation is completed, the survey team will conduct a final inspection. Once the work is found satisfactory, the four approved 10 HP motors will be supplied and installed at the four drainage points under the orders of Tatvdarshi Sant Rampal Ji Maharaj Ji.

Villagers Welcome the Relief Materials

Following the arrival of the pipeline and accessories, villagers welcomed the convoy carrying the materials. A procession moved through Nuna Majra before reaching the programme venue.

Addressing the gathering, Sarpanch Master Jai Bhagwan said the village had presented its proposal only two days earlier. He thanked Tatvdarshi Sant Rampal Ji Maharaj Ji and the volunteers for the prompt response after the survey.

Chairman Representative Sanjay also appreciated the quick action taken after the request. He mentioned that an additional request regarding a tubewell for the village pond had also been discussed.

Expected Impact on the Village

According to the Gram Panchayat, the approved drainage system is expected to remove rainwater from all four waterlogged locations once the pipeline and motors become operational.

The expected benefits include:

  • Improved drainage from residential areas and streets.
  • Better movement for villagers during the rainy season.
  • Protection of agricultural fields and standing crops.
  • Long-term relief from recurring waterlogging.

The campaign representatives also informed villagers that more than 100 villages had already received assistance under Kisan Mazdoor Bachao Abhiyan Phase 2, Shuddh Peyjal Seva Abhiyan, and Pashudhan Bachao Shuddh Jal Pilao Abhiyan, with service activities continuing in different areas.

A Step Towards Resolving a Long-Standing Village Issue

Villagers stated that once the pipeline and four approved motors are installed, rainwater will be able to drain effectively, benefiting both residential areas and agricultural land. The Gram Panchayat expressed gratitude to Tatvdarshi Sant Rampal Ji Maharaj Ji for extending assistance under the Kisan Mazdoor Bachao Abhiyan Phase 2, describing it as the beginning of a permanent solution to the village’s long-standing waterlogging problem.

For more information please do visit SA News YouTube Channel.

Share This Article
Email Copy Link Print
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
BySA News
Follow:
Welcome to SA News, your trusted source for the latest news and updates from India and around the world. Our mission is to provide comprehensive, unbiased, and accurate reporting across various categories including Business, Education, Events, Health, History, Viral, Politics, Science, Sports, Fact Check, and Tech.
Previous Article 40-Year Waterlogging Crisis Solved Sant Rampal Ji Delivers 4000 Ft Pipeline to Gatauli ​A 40-Year Tragedy Ends in 2 Days: Sant Rampal Ji Maharaj Rescues Gatauli Village with 4000-Foot Pipeline
Next Article Karnataka Bandh August 13th Karnataka Bandh on August 13th 2026: What Will Remain Open and What Will be Closed?
Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Popular Posts

World Bank का बड़ा अनुमान: भारत की अर्थव्यवस्था 6.6% की रफ्तार से बढ़ेगी, लेकिन चुनौतियां बरकरार

भारत की GDP वृद्धि दर 6.6%: आज के बदलते वैश्विक माहौल में भारत की अर्थव्यवस्था…

By SA News

How LLMs Like ChatGPT Actually Works: A Complete Simple Guide

How LLM Works: Every week, more than 900 million people ask ChatGPT a question and…

By SA News

Delhi Battles ‘Very Poor’ Air Quality Amidst Government Interventions

Delhi is grappling with "very poor" air quality, as evidenced by the alarming Air Quality…

By SA News

You Might Also Like

Waterlogging Solution in Nagla Sabla–Nagla Shera of Govardhan: 1000 Acres of Land Revived by Sant Rampal Ji Maharaj
Social Welfare Work

End of a Decades-Old Waterlogging Problem: Hope Returns to Villages of Govardhan Through the Initiative of Sant Rampal Ji Maharaj

By SA News
Flood Devastation in Haryana’s Dhana Khurd
Social Welfare Work

Flood Devastation in Haryana’s Dhana Khurd: Saint Rampal Ji Maharaj’s Swift Action Restored Hope to Farmers Within 24 Hours

By SA News
From Crisis to Lasting Boon: How Sant Rampal Ji Maharaj Saved Haryana’s Flood-Hit Sulkhani Village
Social Welfare Work

From Crisis to Lasting Boon: How Sant Rampal Ji Maharaj Saved Haryana’s Flood-Hit Sulkhani Village

By SA News
Maghorra Village Gets 1880 Feet Pipeline for Permanent Drainage from Sant Rampal Ji Maharaj
Social Welfare Work

​A Promise Fulfilled: Sant Rampal Ji Maharaj Completes Maghorra’s Drainage System with an Additional 1880-Foot Pipeline

By SA News
SA NEWS LOGO SA NEWS LOGO
748KLike
340KFollow
13KPin
216KFollow
1.8MSubscribe
3KFollow

About US


Welcome to SA News, your trusted source for the latest news and updates from India and around the world. Our mission is to provide comprehensive, unbiased, and accurate reporting across various categories including Business, Education, Events, Health, History, Viral, Politics, Science, Sports, Fact Check, and Tech.

Top Categories
  • Politics
  • Health
  • Tech
  • Business
  • World
Useful Links
  • About Us
  • Disclaimer
  • Privacy Policy
  • Terms & Conditions
  • Copyright Notice
  • Contact Us
  • Official Website (Jagatguru Sant Rampal Ji Maharaj)

© SA News 2025 | All rights reserved.